Marine Works

S/N PROJECT SCOPE CLIENT LOCALITY DURATION HSE DATA % OF COY PARTICIPATION
1. Geotechnical Investigation,Soil Boring & Core Sampling at Tubu Oml 52 Coastal Line & Ocean Ltd {BRONE SURVEY} Andoni River July 2018 3,072 100%
2. Geotechnical Investigation for the proposed IGPeS Main Office Building IGPeS Gas & Power Limited Trans-Amadi, Port Harcourt February 2018 368 100%
3. Geotechnical Engineering Services at Unspecified Niger Delta Area of SPDC. Contract no. is (NG01005069) Contractor code/N03388 SPDC Niger Delta Areas Zarama, Tunu,Assa North.Belama F/S.Ekulama II f/s .Nembe II f/s. Koroma.Bonny well 02& well . Opukushi, Adibawa, Forcados, Assa, Epu, Gbaran, Obelle, Ubie, Northbank CPFPLUS SEVERAL OTHER FLOW STATIONS AND GAS PLANTS Ongoing 15,000 Manhours without LTI 100%
4. Geotechnical Investigation and resistivity Survey at Zaria First kepler Int’l Nig Ltd Zaria Dec 2017 6,200 100%
5. Geotechnical and Topographical investigation at Proton delta sunrise 150mw natural gas simple cycle power plant project Group Five Project Ltd/Mopel Sapele-Delta State Nigeria May to June 2017 8000 100%
6. Geotechnical Investigation for proposed Two-Storey Office building West African Examination Council Yenagoa, Bayelsa State February 2017 385 100%
7. Geotechnical Investigation Services for OML 148 Enageed Resources Limited Ajoki, Edo State February 2017 496 100%
8. Geotechnical Survey on Water front Uptonville Nigeria Limited Rumuolumini, Port Harcourt February 2017 144 100%
9. Geotechnical Investigation at ANGO 1 & 2 and 4 Flow stations CONOIL Producing Limited ANGO 1 & 2 And 4 Flow Station, Bayelsa State November 2016 448 100%
10. Provision of load bearing test for K2s Project Nestoil Ltd Soku Gas Plant October 2016 329 100%
11. Geophysical Survey for proposed tower IGPeS Gas & Power Limited Forcados Delta State September 2015 896 100%
12. Geotechnical survey for Sonam develop project & EESP Chevron Nig ltd 1/c TCO Marine Okan PRP June 2015 2230 100%
13. Geotechnical survey for Okan jacket 25,39 & 65 Chevron Nig Ltd. Okan Jacket 25,39 & 65 Delta state April 2015-June 2015 11,096 100%
14. Geotechnical survey for engineering design of NPDC Warri Warehouse reinforced concrete bridge NPDC 1/c Point Engineering Warri Delta state Jan 2015 690 100%
15. Soil boring services for EESP Chevron Nig Ltd. Escravos, Delta state Nov 2014-Dec 2014 2100 100%
16. Geotechnical services at the proposed polaku pipe-mill manufacturing site NCDMB PolakuBayelsa state July 2014 1240 100%
17. Geotechnical investigation for SNEPCo Polaku May 2014-June 2014 2800 100%
18. Geotechnical Investigation for proposed Nestoil ship repair yard NESTOIL Abuloma, portharcourt Feb 2014 680 100%
19. Soil boring services at Meren field Chevron Nig Ltd Meren Jackets 5,8,29,40 & 52 Delta state Aug 2013-Oct 2013 18,960 100%
20. Design & piling works for Construction of Unity Bridge at Nembe Bayelsa state Govt. Nembe Completed 2010 13280 Manhours without LTI 100%
21. Rock investigation SNC-LAVALIN Jebba, Niger State Completed 2010 1500 Manhours without LTI 100%
22. Sub soil investigation for the Dibi Long Term Facility Project Chevron Nigeria Limited Dibi, Warri, Delta State July 2009 –Nov. 2009 10432Manhours without LTI 100%
23. Sub soil investigation for proposed PetroleumDelivery System OandoPlc c/o Geomarine Systems Limited Pipeline Routing Tarkwa Bay Shore to Light House Creek Sept 2007- Date 10560 Man-hours without LTI 100%
24. Provision of Geotechnical Services Chevron Nigeria Ltd Malu 23, Meren 25, 75, Jacket 45, Mina 1, Meren 52, Parabe 31, Malu 11, Mefa 9, Kegba, OkannwpPLUS SEVERAL OTHER STATIONS March 2006 to April 2012 No LTI 100%
25. Geo-exploratory survey works for the upgrade of AlsconPlant Geomarine Systems Limited IkotAbasi – Imo Rivers March –May 2008 2,800 Man hours without LTI 100%
26. Sub soil investigation for Oil Drilling Barge positioning Consolidated Oil and Gas Nigeria Ltd (CONOIL) Akasa, Brass L.G.A. Bayelsa State. October 2005 3465 Man hours without LTI 100%
27. Over-water geotechnical investigation – Water depth 3–21m SPDC River Terminal Estuary Jan. 2002 4860 Man Hours without LTI 100%
28. Over-water geotechnical investigation Water depths 6 – 28 meters (Sub-Contract) (NAOC / ADAMAC) Bonny River Terminal May 2004 4140 Man Hours without LTI 100%
29. Sub soil investigation for the Escravos River Crossing Project Chevron Nigeria Limited c/o Geodetic Positioning Services Limited Escravos , Warri, Delta state June 2009-Date 32420Manh ours without LTI 100%

Pipelines/Facilities

S/N PROJECT SCOPE CLIENT LOCALITY DURATION HSE DATA % OF COY PARTICIPATION
30. Sub soil investigation for proposed PetroleumDelivery System OandoPlc c/o Geomarine Systems Limited Pipeline Routing Tarkwa Bay Shore to Light House Creek Sept 2007- Date 10560 Man-hours without LTI 100%
31. Subsoil Investigation/Ground Water monitoring well works for landfill construction SPDC c/o Chemical &Environmental Engineering Ltd Owerri Eneka Waste Facility, Eneka Rivers State Nov 2005 2772 Man Hours without LTI 100%
32. Geotechnical investigation for Ocean Terminal DERLITA Marine Group Port Harcourt Beletiama, Brass L.G.A. Bayelsa State 40 Days 6840 Man Hours without LTI 100%
33. Geotechnical investigation for ContainerManufacturing/Modular Fabrication Yard DERLITA Marine Group Port Harcourt EteoEleme L.G.A. Rivers State. October 2005 5760 Man hours without LTI 100%
34. Geo-physical survey and borehole drilling MTN Nigeria Port Harcourt September 2005 1890 Man hours 100%
35. Subsoil investigation/ Pipeline Resistivity Survey for pipeline laying SPDC Swamp facility location (Nembe-Bonny EGGS GasPipeline) July 2004 4860 Man Hours without LTI 100%
36. Subsoil Investigation for ForcadosYokri Integrated Project (FYIP) HMS Consortium – Port Harcourt (TRIPATITE WITH SPDC) North Bank, South Bank and Yokri Flow Stations 2001-2002 8200 Man hours without LTI 100%
37. Geo-physical survey and borehole drilling ElemePetrochemicalsEleme Port Harcourt 2001 756 Man-hours without LTI 100%
38. Geo-technical investigation for 36” Pipeline Project National Agip Oil Company Limited Between Rumuji and Bonny Crossing May 2004 3510 Man-hours without LTI 100%

Gas Plants/Flow Station

S/N PROJECT SCOPE CLIENT LOCALITY DURATION HSE DATA % OF COY PARTICIPATION
39. Subsoil investigation for residential camp upgrading GAMJI Marine Services Ltd Clough Creek Flow Station, Bayelsa State. February 2003 1024 Man hours without LTI 100%
40. Sub soil investigation for elevated water tanks SPDC Bush bar, Nembe L.G.A
Oluasiri, Nembe L.G.A
Kolo Creek Flow Station Yenegoa
Elem-Kalabari village Bayelsa State
Nembe Bassambiri Bayelsa State
Olobiri flow Station Bille village Bayelsa State
Akipelai, OgbiaBayelsa State
Nembe Creek 1,2 & 3 Flow Stations Soku village
2002
2002
2003
2001
2002
2002
2003
2002
100%
41. Soil Test for Construction of Gas supply to PHCN power plant at Gbaran and Egbema, Engineering, Procurement and Construction. Frazimex Limited Gbaran and Egbema 1 month No LTI 100%
42. Soil Test for Construction of Distribution Substations at Aba. Geometric Power Limited Aba 2 months No LTI 100%
43. Geo-technical investigation for Installation of Telecommunication Towers SPDC c/o RANC Limited Imo River 1 FLB Imo River 2 Flow Station Imo River 3 Flow Station Isimiri,Assa, Amukpe, Ughelli, AfamFlow Stations Utorogu Gas Plant SPDC Residential Area PHC Kidney Island June 2005- Nov.2007 10560 Man-hours without LTI 100%
44. Soil Investigation for proposed Oil Starage Tank Farm Shorelink Oil and Gas Limited Railway Land Port Harcourt Station Completed No LTI 100%
45. Soil Investigation for proposed Two Nos. Silos Building Valleumbra Flour Mills Nigeria Limited Nigerian Ports Authority Port Harcourt Completed No LTI 100%